Rotations
Rotations · Nuclear · Progress
Read from the active version, by effective date.
Program, Nuclear Work Guide specification, 2026-09-24 (UT Nuclear Cardiology curriculum, revision 06/21/2023)
An external course, required for the NRC and CBNC credentialing pathway.
Program, Nuclear Work Guide specification, 2026-09-24 (UT Nuclear Cardiology curriculum, revision 06/21/2023)
The program’s own target, not a COCATS threshold.
Stated for Level II.
Counted within the 200 exercise treadmills, and stated for Level II.
Program, Nuclear Work Guide specification, 2026-09-24 (UT Nuclear Cardiology curriculum, revision 06/21/2023)
Against the Level II target, which is published above.
Whether the count comes from MedHub, from CSImport, or from verified manual entry. No total is shown until one of them is connected.
Answered by: Program
Counted apart from SPECT.
Whether PET volume is logged separately anywhere today.
Answered by: Program
Observed, supervised and performed, counted separately.
Where the three are recorded apart from each other.
Answered by: Program
Against the 2 months for Level I and 4 for Level II.
Whether months are counted from the block schedule automatically or confirmed by the coordinator. The block schedule is here; nobody has said it is the source of record for this.
Answered by: Program
The F2 requirement, as a checklist.
Who signs the week off, and where that is recorded.
Answered by: Program
Nuclear physics and radiation safety — required for the Level II credentialing pathway.
Which course the program uses, how a fellow enrolls, who pays, and where completion is recorded for the NRC and CBNC pathway.
Answered by: Program
Level I, Level II, and what is still outstanding.
A readiness summary needs counts, and there are none. It stays here as the shape §07 asked for; it will say something the day a log is connected.
Answered by: Program
No counts and no progress bars. UTKardio is connected to no procedure log, so there is no numerator for any of these — and a fellow reading “212 of 300” that this page worked out for itself would be deciding they had met a nuclear training level on our arithmetic. The targets above are published standards, dated and sourced, read from a table rather than written into this page.
Listed rather than guessed. These are the facts this page cannot answer.
Last updated 2026-09-24 · Program, Nuclear Work Guide specification, 2026-09-24
These guides are maintained by the fellowship. Sign in to suggest a workflow, propose an edit, or report something out of date.